中文翻译英文(难度比较大,很具挑战性)

电梯安装吊篮主要由提升机、篮体支架、防坠落安全钳、电控系统以及悬挂等重要部件组成。电梯安装吊篮结构开发与强度校核是电梯安装中一项相当重要的工作。本文主要介绍了新型电梯安装吊篮结构设计的优势和力学分析,以ansys有限元分析软件为支撑,对新型电梯安装吊篮某些部件进行强度分析和校核。然后用autoCAD软件画出吊篮主要零部件的装配图。选择吊篮动力系统中电机的功率,计算出电机的力矩。 经过上述的工作后,我们可以得出新型电梯安装吊篮是完全符合预定的技术要求的,即在正常的工作状态下吊篮是正常工作的。希望那位大大帮小弟翻译下,小弟感激不尽。那种随便到在线翻译复制过来的家伙们就不要来的。。。翻译的好,小弟还可以再追加分的,谢谢!XX的 都说不要复制在线翻译了 还粘贴过来。。。 没一个语法行的。。。
2026年09月19日 17:43
有5个网友回答
网友(1):

Elevator's installation basket hoisting machine, mainly by basket stents and safety control systems and suspension clamp, etc. Parts. Elevator's installation suspended structure development and intensity is an elevator's installation is very important work. This paper mainly introduces the new elevator's installation basket structure design of the advantage and mechanical analysis, with ansys finite element analysis software for support of new elevator's installation, some parts basket strength analysis and test. Then use autoCAD software draw basket of main components of assembly. Choose basket in the power of the motor power system, calculate the torque motor.
After the work, we can conclude new elevator's installation basket is completely meet the technical requirements of the reservation in normal working condition is normal work of the basket.

网友(2):

Mainly by the elevator installation elevator basket, basket of the stent, anti-fall safety gear, electronic control systems, and suspension and other important components. Development of elevator installation Barrel Strength Check is an important elevator installation work. This paper describes the design of new elevators installed Barrel advantages and mechanical analysis, finite element analysis with ansys software support, installation of hanging baskets on the new elevator strength analysis of some components and check. AutoCAD software basket and then draw the main parts of the assembly drawing. Select Barrel power system motor power, torque the motor is calculated.
After the above work, we can draw a new elevator installed hanging baskets are fully consistent with the intended technical requirements, which under normal working conditions it is normal for basket work.

网友(3):

我帮你翻译
Mainly by the elevator installation elevator basket, basket of the stent, anti-fall safety gear, electronic control systems, and suspension and other important components. Development of elevator installation Barrel Strength Check is an important lift installation work. This paper describes the design of new elevators installed Barrel advantages and mechanical analysis, finite element analysis with ansys software support, installation of hanging baskets on the new elevator some parts strength analysis and verification. AutoCAD software basket and then draw the main parts of the assembly drawing. Select Barrel power system motor power, torque the motor is calculated.
After the above work, we can draw a new elevator installed basket is fully consistent with the intended technical requirements, that is, in normal working condition is a normal work basket.

网友(4):

The elevator installs the hanging basket mainly by the elevator, the basket body support, anti-fall safety tong, electronic control system and suspension and other important components. Development of elevator installation Barrel Strength Check is an important lift installation work. This article describes the design of new elevators
installed Barrel advantages and mechanical analysis,Finite element analysis with ansys software support
New elevator installed on the strength of some parts basket and check.
AutoCAD software basket and then draw the main parts of the assembly drawing.
Select Barrel power system motor power, torque the motor is calculated.
After the above work, we can draw a new elevator installed basket is fully consistent with the intended technical requirements, that is, in normal working condition is a normal work basket.

网友(5):

看我的 Mainly by the elevator installation elevator basket, basket of the stent, anti-fall safety gear, electronic control systems, and suspension and other important components. Development of elevator installation Barrel Strength Check is an important lift installation work. This paper describes the design of new elevators installed Barrel advantages and mechanical analysis, finite element analysis with ansys software support, installation of hanging baskets on the new elevator some parts strength analysis and verification. AutoCAD software basket and then draw the main parts of the assembly drawing. Select Barrel power system motor power, torque the motor is calculated.
After the above work, we can draw a new elevator installed basket is fully consistent with the intended technical requirements, that is, in normal working condition is a normal work basket.